Facebook| Youtube

Bienvenido a Wuxi Dingjisheng Equipment Manufacturing Co., Ltd.

Wuxi Dingjisheng Equipment Manufacturing Co., Ltd

Dingjisheng Equipment Manufacturing Co., Ltd.Fabricante profesional de equipos de refrigeración e intercambio de calor

info@cooling-tower.net

Soluciones para la industria de la forja

2023-03-09
Information Summary: One backup water circulation pump is in use and one is on standby. If one of the water pumps fails during the operation of the equipment, it can be switched to the other water pump in time to prevent the coil from burning out due to the temperature of the equipment. In case of sudden power outage 》Security

One water circulation pump is in use and the other is in reserve. During the operation of the equipment, if one of the water pumps fails, it can be switched to the other water pump in time to effectively prevent the sudden power failure of the coil furnace due to the high temperature of the equipment. The gasoline engine pump will start automatically, which can volatilize the residual heat of the equipment and effectively protect the machine.

》Intelligence
A time delay relay is set between the cooling tower and the electric furnace to detect the temperature and automatically shut down the cooling tower. Employees can safely leave after work to reduce labor costs and job errors.
Consulta por correo
No dude en enviar su consulta en el siguiente formulario. Le responderemos en 24 horas.
  • Address: Xibei Town Industrial Park, Xishan District, Wuxi, China    Contact: Jack Du
    Cell Phone: +86-13291226678
    E-mail:info@cooling-tower.net
Whatsapp
Derechos de autor © 2023: Wuxi Dingjisheng Equipment Manufacturing Co., Ltd.